Compare Virginia vs Texas vs Georgia vs Ohio

Side-by-side capacity, pipeline, the announced-vs-documented gap, time to power and evidence coverage. MW figures are floors: they sum only facilities that disclose a figure, so a low number with low coverage means “not collected”, not “small”. Data as of Sep 29, 2026.

Comparison of Virginia, Texas, Georgia, Ohio
MetricVirginiaTexasGeorgiaOhio
Facilities tracked4871955899
Power online (floor)
Operating sites with a figure; evidence mix below
4.3 GW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
1.79 GW
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.11%EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.89%
923 MW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
1.83 GW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
Pipeline (floor)
Planned MW at sites under construction or planned
586 MW8.17 GW—1.8 GW
Announced
Largest MW reported by a company, utility, government or press source
1.02 GW12.67 GW—3.72 GW
Documented
Per site: grid-backed MW, or operational + under-construction MW
6.19 GW7.71 GW923 MW3.63 GW
Announced, no grid/construction/operating record
Sites announced ≥ 100 MW with nothing documented yet
—4.36 GW—650 MW
Pending MW: < 1 year
Announced minus operational, by time-to-power bucket
—4.55 GW—870 MW
Pending MW: 1–2 years
Announced minus operational, by time-to-power bucket
586 MW3.27 GW—933 MW
Pending MW: 2–4 years
Announced minus operational, by time-to-power bucket
—1.2 GW——
Pending MW: 4+ years
Announced minus operational, by time-to-power bucket
—2.16 GW—650 MW
Pending MW: Insufficient evidence
Announced minus operational, by time-to-power bucket
————
Facilities with a power figure14% (69)11% (21)5% (3)9% (9)
Facilities with confirmed evidence87% (422)8% (15)0% (0)67% (66)