DC
/

Data centers near Racine County, WI

Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.

Radius:10 mi25 mi50 miLocation from the U.S. Census Gazetteer (centroid).

7 tracked facilities within 50 miles. 3 disclose power, 442 MW online (a floor: most sites don't disclose). Statewide, 25% of Wisconsin facilities have a power figure.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
  1. Operating + expandingAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.AI campus· Mount Pleasant, Racine County, WI
    Operator
    Microsoft
    Tenants / users
    OpenAI, Microsoft
    Power online
    442 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Pipeline
    2.72 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Likely utility
    We Energies · ISO/RTO: MISO
    • Apr 16, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Apr 16, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
    • Apr 16, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational. X post from Microsoft saying this date for Fairwater becoming operational.
  2. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Franklin, Milwaukee County, WI
    Operator
    —
    Tenants / users
    —
    Power online
    —
    Pipeline
    2 MW planned AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
    Likely utility
    We Energies · ISO/RTO: MISO
  3. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Milwaukee, Milwaukee County, WI
    Operator
    —
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    We Energies · ISO/RTO: MISO
  4. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Milwaukee, Milwaukee County, WI
    Operator
    Potawatomi Business Development Corporation
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    We Energies · ISO/RTO: MISO
  5. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Waukesha, Waukesha County, WI
    Operator
    We Energies
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    We Energies · ISO/RTO: MISO
  6. VISA40 mi
    OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Vernon Hills, Lake County, IL
    Operator
    VISA
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    Commonwealth Edison (ComEd) · ISO/RTO: PJM
  7. Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Ozaukee County, WI
    Operator
    Vantage Data Centers
    Tenants / users
    OpenAI
    Power online
    —
    Pipeline
    1.3 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
    Likely utility
    We Energies · ISO/RTO: MISO
    • Jan 2, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Ground broken for the facility, land clearing begins for all buildings