Capacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Follow a facility, company, utility, state or ISO by email, or subscribe to the feed in any RSS reader.

Each change is tagged by evidence: ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned

Clear
Changes per month by evidence level. Click a month to filter.
2023-122026-11
This view:Download CSVJSONAPI docs
  1. Nov 9, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  2. Nov 9, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  3. Nov 9, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  4. Nov 9, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  5. Nov 9, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  6. Nov 9, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  7. Nov 2, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  8. Nov 2, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  9. Nov 2, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  10. Nov 2, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  11. Nov 2, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  12. Nov 2, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  13. Oct 26, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  14. Oct 26, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  15. Oct 26, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  16. Oct 26, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  17. Oct 26, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  18. Oct 26, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  19. Oct 19, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  20. Oct 19, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  21. Oct 19, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  22. Oct 19, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  23. Oct 19, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  24. Oct 19, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  25. Oct 14, 2026
    Lumen McLean · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Last recorded sale price: $52M → $29M
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0294 06 0104: $29,000,000.
  26. Oct 12, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  27. Oct 12, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  28. Oct 12, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  29. Oct 12, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  30. Oct 12, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  31. Oct 12, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  32. Oct 5, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  33. Oct 5, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  34. Oct 5, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  35. Oct 5, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  36. Oct 5, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  37. Oct 5, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  38. Jun 16, 2026
    Google Arcola · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.
    Source: Epoch AI
  39. May 20, 2026
    CoreWeave Chester VA · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 27 MW → 82 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 38 MW → 114 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.
    Source: Epoch AI
  40. May 20, 2026
    Google Bristow · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 174 MW → 238 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 208 MW → 286 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 3
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 is operational, based off of colored motion artifacts from cooling towers.
    Source: Epoch AI
  41. Mar 17, 2026
    Amazon IAD-500 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0001 (no sale price disclosed).
  42. Mar 17, 2026
    Unnamed data center — Redskin Drive · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0002 (no sale price disclosed).
  43. Mar 17, 2026
    Unnamed data center — Redskin Drive · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0003 (no sale price disclosed).
  44. Sep 15, 2025
    Equinix DC7 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0392 01 0013D: $37,000,000.
  45. May 6, 2025
    STACK Infrastructure NVA02 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7595-65-9789.00.
  46. May 6, 2025
    STACK NVA02B · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7595-85-3742.
  47. Apr 29, 2025
    Google Bristow · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 87 MW → 174 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 104 MW → 208 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 is operational, based off it being at least 12 months since the roof was complete. Building 3 is finishing construction of cooling towers.
    Source: Epoch AI
  48. Apr 23, 2025
    Menlo Digital MD-DC1 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0244 03 0002B (no sale price disclosed).
  49. Apr 10, 2025
    Unnamed data center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7596-61-8378.00.
  50. Apr 10, 2025
    Unnamed data center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7596-62-9148.00.
  51. Apr 1, 2025
    CoreSite VA2 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Last recorded sale price: $44.5M → $53M
  52. Jan 22, 2025
    Amazon IAD-195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-36-1468.
  53. Jan 22, 2025
    Amazon IAD-196 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-36-2834.
  54. Jan 22, 2025
    Amazon IAD-197 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-35-5597.
  55. 2025
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0027 — Active, 183,925 sq ft proposed.
  56. 2025
    Proposed data center — Amazon Data Services · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2025-0012 — Approved, 550,000 sq ft proposed.
  57. 2025
    Proposed data center — Ashburn Village Office Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0061 — Active, 469,479 sq ft proposed.
  58. 2025
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0028 — Active, 230,530 sq ft proposed.
  59. 2025
    Proposed data center — Cardinal Industrial Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan TLSPEX2025-0003 — Active, 315,000 sq ft proposed.
  60. 2025
    Proposed data center — EPLAN-2025-0126 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0126 — Active, 1,388,880 sq ft proposed.
  61. 2025
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0195 — Active, 751,902 sq ft proposed.
  62. 2025
    Proposed data center — Evergreen Meadows · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0049 — Active, 191,000 sq ft proposed.
  63. 2025
    Proposed data center — Gateway North · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0034 — Active, 3,161,378 sq ft proposed.
  64. 2025
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0102 — Active, 16,049 sq ft proposed.
  65. 2025
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0015 — Active, 20,000 sq ft proposed.
  66. 2025
    Proposed data center — Stack Broad Run Land Condo · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2025-0135 — Approved, 376,862 sq ft proposed.
  67. 2025
    Proposed data center — Sterling Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0027 — Active, 315,582 sq ft proposed.
  68. Oct 7, 2024
    NTT VA10 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-56-8403 (owner of record: Ntt Global Data Centers Va10 LLC Attn: Legal Dept).
  69. Oct 1, 2024
    Google Arcola · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Building 1 foundation started
    Source: Epoch AI
  70. Oct 1, 2024
    STACK Infrastructure NVA02 · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery (a clear image of this c…
    Source: Epoch AI
  71. Jul 3, 2024
    STACK NVA02D · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7595-76-6544.00 (owner of record: Si Nva 04 LLC Attn Property Tax).
  72. Jun 25, 2024
    Amazon IAD-1 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0343 09 0004A (no sale price disclosed).
  73. Jun 25, 2024
    Amazon IAD-22 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0343 09 0004A (no sale price disclosed).
  74. May 6, 2024
    Amazon IAD-500 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0001 (no sale price disclosed).
  75. May 6, 2024
    Unnamed data center — Redskin Drive · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0002 (no sale price disclosed).
  76. May 6, 2024
    Unnamed data center — Redskin Drive · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0003 (no sale price disclosed).
  77. Apr 30, 2024
    CoreWeave Chester VA · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 18 MW → 27 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 25 MW → 38 MW
    Source: Epoch AI
  78. Apr 29, 2024
    Google Bristow · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers. Building 2 is undergoing construction.
    Source: Epoch AI
  79. Jan 31, 2024
    CoreWeave Chester VA · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1's second data hall scheduled to come online this month.
    Source: Epoch AI
  80. 2024
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0193 — Approved, 161,950 sq ft proposed.
  81. 2024
    Equinix DC22 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0047 — Active, 96,842 sq ft proposed.
  82. 2024
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0047 — Active, 96,842 sq ft proposed.
  83. 2024
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0077 — Active, 1,176,000 sq ft proposed.
  84. 2024
    Proposed data center — Broad Run Business Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0155 — Approved: Conditionally, 600,742 sq ft proposed.
  85. 2024
    Proposed data center — Commonwealth Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0105 — Active, 285,322 sq ft proposed.
  86. 2024
    Proposed data center — Concorde Industrial Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0002 — Active, 449,311 sq ft proposed.
  87. 2024
    Proposed data center — Crosstrail Industrl Land Condo · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0211 — Active, 304,794 sq ft proposed.
  88. 2024
    Proposed data center — Digital Dulles Land Condo · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0060 — Active, 4,355,759 sq ft proposed.
  89. 2024
    Proposed data center — Downs Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0041 — Active, 1,751,803 sq ft proposed.
  90. 2024
    Proposed data center — Dulles Trade Center 2 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0042 — Active, 835,330 sq ft proposed.
  91. 2024
    Proposed data center — EPLAN-2024-0058 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0058 — Active, 256,550 sq ft proposed.
  92. 2024
    Proposed data center — EPLAN-2024-0163 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0163 — Active, 106,332 sq ft proposed.
  93. 2024
    Proposed data center — EPLAN-2024-0205 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0205 — Active, 1,239,000 sq ft proposed.
  94. 2024
    Proposed data center — EPLAN-2024-0212 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0212 — Active, 401,050 sq ft proposed.
  95. 2024
    Proposed data center — Farah Naples · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0184 — Active, 101,092 sq ft proposed.
  96. 2024
    Proposed data center — Gateway North · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0178 — Active, 76,275 sq ft proposed.
  97. 2024
    Proposed data center — Holiday Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0056 — Active, 973,305 sq ft proposed.
  98. 2024
    Proposed data center — LEGI-2024-0037 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0037 — Active, 444,307 sq ft proposed.
  99. 2024
    Proposed data center — LEGI-2024-0039 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0039 — Active, 1,359,153 sq ft proposed.
  100. 2024
    Proposed data center — Loudoun Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0030 — Active, 666,000 sq ft proposed.
  101. 2024
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0058 — Active, 196,138 sq ft proposed.
  102. 2024
    Proposed data center — Mercure Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0161 — Active, 76,020 sq ft proposed.
  103. 2024
    Proposed data center — Mercure Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0162 — Active, 178,648 sq ft proposed.
  104. 2024
    Proposed data center — Mercure Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0180 — Active, 101,579 sq ft proposed.
  105. 2024
    Proposed data center — Mercure Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0181 — Active, 104,556 sq ft proposed.
  106. 2024
    Proposed data center — Mercure Business Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0210 — Active, 48,120 sq ft proposed.
  107. 2024
    Proposed data center — Mid Dulles Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0154 — Active, 374,670 sq ft proposed.
  108. 2024
    Proposed data center — Paragonpark · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0200 — Active, 768,255 sq ft proposed.
  109. 2024
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0036 — Active, 697,500 sq ft proposed.
  110. 2024
    Proposed data center — Prologis Park Gateway · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0004 — Active, 1,089,044 sq ft proposed.
  111. 2024
    Proposed data center — Spring Valley Farms · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0074 — Active, 3,250,000 sq ft proposed.
  112. 2024
    Proposed data center — Steeplechase · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0081 — Approved: Conditionally, 244,400 sq ft proposed.
  113. 2024
    Proposed data center — Sterling Park Ip · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0182 — Active, 52,744 sq ft proposed.
  114. 2024
    Proposed data center — Summit At Dulles · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0061 — Active, 592,772 sq ft proposed.
  115. 2024
    Proposed data center — TLREZN2024-0003 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan TLREZN2024-0003 — Active, 825,500 sq ft proposed.
  116. 2024
    Proposed data center — Tuscarora Crossing Lb1 Ph1 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0059 — Approved: Conditionally, 520,950 sq ft proposed.
  117. 2024
    Proposed data center — Uss Industrial Park · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0003 — Active, 2,275,600 sq ft proposed.