Oracle
Follow changes (RSS)Hyperscaler · oracle.com/cloud · also matched as Oracle Cloud Infrastructure, OCI
Linked facilities
5
States
4
Reported power online
590 MW
Reported planned capacity
8.29 GW
Power totals sum only facilities with a reported or estimated figure, across all roles (a company can be tenant at one site and owner at another).
Loading map…
US footprint by state
- Texas2 sites · 590 MW
- New Mexico1 sites
- Michigan1 sites
- Wisconsin1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Powered by
- American Electric Power1 site · ConfirmedOpenAI Stargate Abilene
- DTE Electric1 site · ConfirmedOpenAI Stargate Michigan
- Taylor Electric Coop INC - (Tx)1 site · UnverifiedOpenAI Stargate Shackelford
- We Energies1 site · ConfirmedOpenAI Stargate Wisconsin
Developed by
- Vantage Data Centers2 sites · LikelyOpenAI Stargate Shackelford, OpenAI Stargate Wisconsin
- Crusoe1 site · ConfirmedOpenAI Stargate Abilene
- Related Digital1 site · LikelyOpenAI Stargate Michigan
Backed by
Invests in
- Crusoe1 site · ConfirmedOpenAI Stargate Abilene
- Vantage Data Centers1 site · LikelyOpenAI Stargate Shackelford
Serves workloads of
- OpenAI5 sites · ConfirmedOpenAI Stargate Abilene, OpenAI Stargate Michigan, OpenAI Stargate New Mexico
Built by
- Mortenson1 site · ConfirmedOpenAI Stargate Abilene
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| OpenAI Stargate New Mexico | Owner | NM | Under construction | 2.45 GW planned |
| OpenAI Stargate Shackelford | Owner, Investor | Abilene, TX | Under construction | 1.96 GW planned |
| OpenAI Stargate Michigan | Owner | MI | Under construction | 1.4 GW planned |
| OpenAI Stargate Wisconsin | Owner | WI | Under construction | 1.3 GW planned |
| OpenAI Stargate Abilene | Owner, Investor, Tenant | Abilene, TX | Operating + expanding | 590 MW |