DC
/

New Mexico

Facilities
19
2 campuses
Power online
105 MW
1 sites reporting
Under construction
2.45 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
2
105 MW online · 2.45 GW pipeline
AI compute
0.10M
H100-equivalents (est.)
Capital (reported + est.)
$3.3B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 4.16¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW750 MW1.5 GW2.25 GW3 GW2026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced2.45 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction2.45 GW
  • Operational105 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 1Under construction: 1Unverified: 17

Interconnection queues

Active requests to connect to the grid (SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection6.91 GW · 37 requests
Solar + storage 2.91 GWGas 1.48 GWSolar 1.13 GWWind 770 MWStorage 590 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • OpenAI0 MW + 2.45 GW · 1 sites
  • Meta105 MW + 0 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • None (non-RTO region)105 MW + 2.45 GW · 19 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
OpenAI Stargate New MexicoUnder construction—2.45 GW
Meta Los LunasOperating105 MW—

Facilities by status

  • Operating18
  • Under construction1