ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned
Data centers, sorted by Power online
FacilityLocationStatusOperator / ownerTenants / usersPower online ↑PlannedSizeUtility · ISOVerificationLast verified
CYS42 Datacenter
Hyperscale
WY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
MicrosoftShow sources
confidence: likely
———
60,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Black Hills EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
xAI Macrohard Colossus 2
AI campus
Memphis, TN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
SpaceXAI (xAI)Show sources
confidence: likely
———
963,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Memphis Light, Gas and WaterShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
OK
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
112,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Oklahoma Gas & Electric COShow sources
confidence: unverified
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
True North Data Centers
Unclassified
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
True North Data SolutionsShow sources
confidence: likely
———
547,500 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 27, 2026
Compass IAD IE
Colocation
Leesburg, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
Compass DatacentersShow sources
confidence: likely
———
547,500 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 27, 2026
Encompass Minneapolis Facility
Unclassified
Lino Lakes, MN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
EncompassShow sources
confidence: likely
———
74,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Northern States Power CO - MinnesotaShow sources
confidence: likely
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center — 23800 West Valley Parkway
Unclassified
Olathe, KS
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
86,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Evergy MetroShow sources
confidence: unverified
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Oppidan data center
Unclassified
OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
OppidanShow sources
confidence: likely
———
90,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Unnamed data center
Unclassified
WY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
6,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Powder River Energy CorpShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
State of Montana Data Center
Unclassified
MT
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
State of MontanaShow sources
confidence: likely
———
8,500 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Montana-Dakota UtilitiesShow sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Switch Las Vegas 14
Colocation
NV
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
SwitchShow sources
confidence: likely
———
224,500 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Southern California EdisonShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Google
Hyperscale
NE
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
290,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Omaha Public Power DistrictShow sources
confidence: likely
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Google
Hyperscale
NE
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
290,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Omaha Public Power DistrictShow sources
confidence: likely
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Google
Hyperscale
NE
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
290,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Omaha Public Power DistrictShow sources
confidence: likely
SPPEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
QTS NAL 2 DC1
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
327,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
QTS NAL 2 DC2
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
295,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
QTS NAL1 DC2
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
454,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
QTS NAL1 DC1
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
450,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
CyrusOne CHI3
Colocation
IL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
CyrusOneShow sources
confidence: likely
———
169,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Commonwealth Edison (ComEd)Show sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Google
Hyperscale
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
289,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
249,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
249,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
249,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
249,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
248,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
252,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
252,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
252,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
252,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Compass Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
252,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Amazon IAD-168
Hyperscale
Herndon, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
113,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Amazon IAD-500
Hyperscale
Herndon, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
132,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Google NBY-7
Hyperscale
OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
270,700 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Vantage Building 1
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Vantage Data CentersShow sources
confidence: likely
———
491,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Vantage Building 2
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Vantage Data CentersShow sources
confidence: likely
———
476,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Vantage Building 3
Colocation
New Albany, OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Vantage Data CentersShow sources
confidence: likely
———
445,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Microsoft
Hyperscale
WA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
MicrosoftShow sources
confidence: likely
———
143,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Grant County PUDShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
155,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
CPS Energy (City of San Antonio)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Unnamed data center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
155,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
CPS Energy (City of San Antonio)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Unnamed data center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
155,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
CPS Energy (City of San Antonio)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Unnamed data center
Unclassified
MO
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
306,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Union Electric CO - (Mo)Show sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Blockfusion Niagra Falls
Unclassified
Niagara Falls, NY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
8,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Niagara Mohawk Power Corp.Show sources
confidence: likely
NYISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Google
Hyperscale
OR
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
287,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Northern Wasco County PudShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Alinged Data Center DFW-03
Colocation
Mansfield, TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Aligned Data CentersShow sources
confidence: likely
———
188,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Denton County Elec Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Amazon IAD-668
Hyperscale
Leesburg, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
413,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 27, 2026
Amazon IAD-667
Hyperscale
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
414,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
STACK NVA06
Colocation
VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
STACK InfrastructureShow sources
confidence: likely
———
621,000 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 27, 2026
NTT Chicago CH3
Colocation
Itasca, IL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
NTT Global Data CentersShow sources
confidence: likely
———
84,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Commonwealth Edison (ComEd)Show sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
NTT Chicago CH4
Colocation
Itasca, IL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
NTT Global Data CentersShow sources
confidence: likely
———
101,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Commonwealth Edison (ComEd)Show sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Microsoft Data Center 2
Hyperscale
Gainesville, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
MicrosoftShow sources
confidence: likely
———
247,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Unnamed data center
Unclassified
OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
695,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Unnamed data center
Unclassified
OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
695,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
PowerHouse CTP-02
Colocation
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
PowerHouse Data CentersShow sources
confidence: likely
———
85,500 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
NTT RagingWire DC - Hillsboro
Colocation
Hillsboro, OR
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
NTT Global Data CentersShow sources
confidence: likely
———
205,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Portland General ElectricShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
IA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
264,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
MidAmerican EnergyShow sources
confidence: likely
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Unnamed data center
Unclassified
IA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
264,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
MidAmerican EnergyShow sources
confidence: likely
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
East Kentucky Network Datacenter
Unclassified
Ivel, KY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
15,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Kentucky Power COShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
654,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Unnamed data center
Unclassified
AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
654,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Unnamed data center
Unclassified
AZ
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
338,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Salt River ProjectShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Unnamed data center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
13,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Sam Houston Electric Coop INCShow sources
confidence: unverified
MISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Google
Hyperscale
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
283,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
United Electric Coop Service INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Newrays Two LLC Mining
Unclassified
TN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
—————
City of Paris - (Tn)Show sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Amazon IAD-669
Hyperscale
Leesburg, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
413,100 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 27, 2026
AWS
Hyperscale
Leesburg, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
353,300 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Under constructionSep 27, 2026
Google Leesburg Building 3
Unclassified
Leesburg, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: confirmedas of Sep 27, 2026
————
303,900 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
EdgeCore Silicon Valley
Unclassified
CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
80,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Silicon Valley Power (City of Santa Clara)Show sources
confidence: unverified
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
STACK SVY02
Colocation
CA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
STACK InfrastructureShow sources
confidence: likely
——
48 MWAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.Show sources
AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.confidence: likelyas of Sep 30, 2026

“48MW of flexible capacity in the center of innovation..”

136,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Silicon Valley Power (City of Santa Clara)Show sources
confidence: unverified
CAISOEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Announced onlySep 30, 2026
Amazon AWS SAT - 12807 Donop
Hyperscale
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Amazon Web ServicesShow sources
confidence: likely
———
110,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Pedernales Electric Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Prime DFW01-01
Unclassified
Dallas, TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
PrimeShow sources
confidence: likely
———
49,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Farmers Electric Coop, INC - (Tx)Show sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
OH
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
206,700 sq ftConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Show sources
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.confidence: confirmedas of Sep 27, 2026
American Electric PowerShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
Google Mango Farm Building 3
Hyperscale
Bristow, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
290,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
QTS Manassas DC2
Colocation
Manassas, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
128,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
QTS Data Center - Hillsboro 3
Colocation
Hillsboro, OR
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
————
Portland General ElectricShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
QTS Data Center - Hillsboro 3
Colocation
Hillsboro, OR
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
————
Portland General ElectricShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
WA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
504,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Grant County PUDShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
SPC4A
Hyperscale
TN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
GoogleShow sources
confidence: likely
———
340,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Cumberland Elec Member CorpShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
QTS
Colocation
GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
227,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
QTS
Colocation
GA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
341,500 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Georgia PowerShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Meta
Hyperscale
UT
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
MetaShow sources
confidence: likely
———
379,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
PacifiCorpShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Meta
Hyperscale
UT
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
MetaShow sources
confidence: likely
———
310,500 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
PacifiCorpShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
CyrusOne CHI3
Colocation
Aurora, IL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
CyrusOneShow sources
confidence: likely
———
213,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Commonwealth Edison (ComEd)Show sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Edged Chicago ORD01
Unclassified
IL
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
EdgedShow sources
confidence: likely
———
116,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Commonwealth Edison (ComEd)Show sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
114,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: unverified
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Verified operatingSep 27, 2026
CyrusOne DFW4
Colocation
Allen, TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
CyrusOneShow sources
confidence: likely
———
116,400 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Denton County Elec Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Unnamed data center
Unclassified
WY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
247,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Black Hills EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Unnamed data center
Unclassified
WY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
246,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Black Hills EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Unnamed data center
Unclassified
WY
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
251,300 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Black Hills EnergyShow sources
confidence: unverified
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
Unverified—
Aligned Data Centers DFW-04
Colocation
Plano, TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
Aligned Data CentersShow sources
confidence: likely
———
216,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Denton County Elec Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Verizon Wireless
Unclassified
TN
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
—————
Nashville Electric ServiceShow sources
confidence: likely
None (non-RTO region)EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Argo Data Center
Unclassified
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
—————
South Plains Electric Coop INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
Switch: The Rock
Colocation
TX
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
SwitchShow sources
confidence: likely
———
174,800 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Pedernales Electric Coop, INCShow sources
confidence: unverified
ERCOTEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
DC6
Colocation
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
173,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
DC5
Colocation
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
164,100 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
DC4
Colocation
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
QTS Data CentersShow sources
confidence: likely
———
171,000 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
RIC2 DC1
Unclassified
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
256,600 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
RIC2 DC2
Unclassified
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
254,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
RIC2 DC3
Unclassified
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
254,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
RIC2 DC5
Unclassified
Sandston, VA
OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: unverifiedas of Sep 27, 2026
————
254,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026
RIC2 DC6
Unclassified
Sandston, VA
Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
————
254,200 sq ftEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likelyas of Sep 27, 2026
Dominion EnergyShow sources
confidence: likely
PJMEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Show sources
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.confidence: likely
UnverifiedSep 27, 2026