What changed — PJM
Follow
Get changes to PJM
Or subscribe in a feed reader: RSS / Atom
Capacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Follow a facility, company, utility, state or ISO by email, or subscribe to the feed in any RSS reader.
Each change is tagged by evidence: ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned
This view:Download CSVJSONAPI docs- Aug 1, 2026AWS Berwick · PA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 77 MW → 108 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 102 MW → 139 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 3
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a ref…
Source: Epoch AI - Jul 12, 2026Microsoft-Nebius New Jersey · NJ
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
Source: Epoch AI - Jun 16, 2026Google Arcola · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.
Source: Epoch AI - May 28, 2026Meta Prometheus · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).
Source: Licking County, OH — Auditor - May 20, 2026CoreWeave Chester VA · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 27 MW → 82 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 38 MW → 114 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.
Source: Epoch AI - May 20, 2026Google Bristow · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 174 MW → 238 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 208 MW → 286 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 3
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 is operational, based off of colored motion artifacts from cooling towers.
Source: Epoch AI - May 18, 2026Google New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
Source: Epoch AI - May 18, 2026Meta Prometheus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 368 MW → 496 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 478 MW → 645 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 6 → 11
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 7-11 (Meta tents) are operational. In January we saw them look almost complete, with some work still ongoing for power equipment. Assuming 3 more months for commissioning, we expect operation by May. Northern…
Source: Epoch AI - May 14, 2026QTS Richmond 2 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 144 MW → 180 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 202 MW → 252 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 4 → 5
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 5 is estimated to be operational, based on the previous entry.
Source: Epoch AI - May 14, 2026QTS Richmond 3 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 48 MW → 144 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 67 MW → 202 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 3
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 and 3 are operational, based on the previous entry.
Source: Epoch AI - May 1, 2026Google Columbus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 216 MW → 303 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 260 MW → 364 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 3 → 4
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.
Source: Epoch AI - Apr 15, 2026Microsoft-Nebius New Jersey · NJ
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT…
Source: Epoch AI - Mar 23, 2026Anthropic-Amazon New Carlisle · IN
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 626 MW → 910 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 751 MW → 1.09 GW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 11 → 16
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Buildings 12-16 are operational. Based on how long previous buildings took, when they were in a similar state to Buildings 12-16 in December.
Source: Epoch AI - Mar 17, 2026Amazon IAD-500 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0001 (no sale price disclosed).
- Mar 17, 2026Unnamed data center — Redskin Drive · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0002 (no sale price disclosed).
- Mar 17, 2026Unnamed data center — Redskin Drive · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0003 (no sale price disclosed).
- Mar 12, 2026AWS New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 113 MW → 213 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 136 MW → 255 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 5 → 9
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildi…
Source: Epoch AI - Mar 12, 2026Google Lancaster · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
Source: Epoch AI - Mar 9, 2026AWS New Albany · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).
Source: Licking County, OH — Auditor - Feb 13, 2026QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
Source: Epoch AI - Feb 13, 2026QTS Richmond 3 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, b…
Source: Epoch AI - Jan 18, 2026Meta Prometheus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 76 MW → 368 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 99 MW → 478 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 6
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their…
Source: Epoch AI - Jan 7, 2026AWS Berwick · PA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 47 MW → 77 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 66 MW → 102 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 operational estimate. This is based on the progress visible in the September 2025 image. The DEP also issues an air plan approval to add 48 more emergency generators on this date.
Source: Epoch AI - Dec 31, 2025QTS Richmond 2 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 72 MW → 144 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 101 MW → 202 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 4
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.
Source: Epoch AI - Dec 23, 2025Anthropic-Amazon New Carlisle · IN
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 398 MW → 626 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 478 MW → 751 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 7 → 11
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete. The roof is almost complete for Building 17 and 18.
Source: Epoch AI - Dec 2, 2025STACK New Albany · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 222-004355 (no sale price disclosed).
- Nov 19, 2025QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 190 MW → 238 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 266 MW → 333 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 4 → 5
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 5 is operational, based on a complete building and full carpark in a Google Earth image. Construction equipment around Building 1 and 2 has cleared up again.
Source: Epoch AI - Oct 31, 2025Google Lancaster · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 68 MW → 137 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 82 MW → 164 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on.
Source: Epoch AI - Oct 14, 2025Google New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 222 MW → 333 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 267 MW → 400 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 3 → 4
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling…
Source: Epoch AI - Oct 14, 2025Meta Prometheus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18 roof is complete. The on-site power …
Source: Epoch AI - Oct 12, 2025OpenAI Stargate Lordstown · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins in the front of the site (the side facing the Ohio Turnpike), clearing away a parking lot and solar array
Source: Epoch AI - Oct 1, 2025Google Columbus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 130 MW → 216 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 156 MW → 260 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 3
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 operational. Surrounding roads finished, no more visible construction.
Source: Epoch AI - Sep 15, 2025Equinix DC7 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0392 01 0013D: $37,000,000.
- Sep 9, 2025AWS Berwick · PA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 operational estimate. According to Google Earth Satellite Imagery from this date, Building 1 appears structurally complete and likely operational, while Building 2 is still missing two generators.
Source: Epoch AI - Jul 15, 2025CoreWeave Lancaster Greenfield site · PA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Coreweave announces $6 billion investment into Lancaster data centers, at two former printing press sites.
Source: Epoch AI - Jun 23, 2025Anthropic-Amazon New Carlisle · IN
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 7
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Buildings 1-7 are operational. Based on all of the roofs being completed for over 5 months.
Source: Epoch AI - Jun 3, 2025QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 142 MW → 190 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 199 MW → 266 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 3 → 4
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 4 is operational, based on a complete building and full carpark in a Google Earth image. Building 5 does not seem quite operational given the empty carpark and construction activity at the perimeter.
Source: Epoch AI - Jun 1, 2025Google New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 144 MW → 222 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 173 MW → 267 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 3
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some…
Source: Epoch AI - May 6, 2025AWS · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7595-85-3742.
- May 6, 2025STACK Infrastructure NVA02 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7595-65-9789.00.
- Apr 29, 2025Google Bristow · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 87 MW → 174 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 104 MW → 208 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 is operational, based off it being at least 12 months since the roof was complete. Building 3 is finishing construction of cooling towers.
Source: Epoch AI - Apr 23, 2025Menlo Digital MD-DC1 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0244 03 0002B (no sale price disclosed).
- Apr 10, 2025Unnamed data center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7596-61-8378.00.
- Apr 10, 2025Unnamed data center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7596-62-9148.00.
- Apr 9, 2025AWS New Albany · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111756-00.024 (no sale price disclosed).
Source: Licking County, OH — Auditor - Apr 1, 2025CoreSite VA2 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Last recorded sale price: $44.5M → $53M
- Mar 1, 2025Google Columbus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 65 MW → 130 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 78 MW → 156 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 operational. Parking complete, no more visible construction.
Source: Epoch AI - Feb 13, 2025AWS New Albany · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111648-00.000 (no sale price disclosed).
Source: Licking County, OH — Auditor - Feb 4, 2025QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 94 MW → 142 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 132 MW → 199 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 3
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 3 is operational, based on the building looking complete and the carpark to the south being full. Three more backup generators added to the Building 1 and 2 area, with a lot more construction equipment again …
Source: Epoch AI - Feb 4, 2025QTS Richmond 2 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 and 2 are operational, based on the east substation looking complete and the carparks being more full. Building 3 has cooling and generators mostly installed. Building 4 roof is partly completed.
Source: Epoch AI - Jan 22, 2025Amazon IAD-195 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-36-1468.
- Jan 22, 2025Amazon IAD-196 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-36-2834.
- Jan 22, 2025Amazon IAD-197 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-35-5597.
- 2025Equinix Ashburn DC18 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0027 — Active, 183,925 sq ft proposed.
- 2025Proposed data center — Amazon Data Services · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2025-0012 — Approved, 550,000 sq ft proposed.
- 2025Proposed data center — Ashburn Village Office Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0061 — Active, 469,479 sq ft proposed.
- 2025Proposed data center — Beaumeade · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0028 — Active, 230,530 sq ft proposed.
- 2025Proposed data center — Cardinal Industrial Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan TLSPEX2025-0003 — Active, 315,000 sq ft proposed.
- 2025Proposed data center — EPLAN-2025-0126 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0126 — Active, 1,388,880 sq ft proposed.
- 2025Proposed data center — EPLAN-2025-0195 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0195 — Active, 751,902 sq ft proposed.
- 2025Proposed data center — Evergreen Meadows · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0049 — Active, 191,000 sq ft proposed.
- 2025Proposed data center — Gateway North · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0034 — Active, 3,161,378 sq ft proposed.
- 2025Proposed data center — Prologis Exchange · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0102 — Active, 16,049 sq ft proposed.
- 2025Proposed data center — Sdc Ashburn · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2025-0015 — Active, 20,000 sq ft proposed.
- 2025Proposed data center — Stack Broad Run Land Condo · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2025-0135 — Approved, 376,862 sq ft proposed.
- 2025Proposed data center — Sterling Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2025-0027 — Active, 315,582 sq ft proposed.
- Dec 1, 2024AWS New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 5
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Buildings 5-9 (eastern campus) operational. New Albany’s Dec. 2024 report lists AWS partial occupancy for 5 buildings at the eastern campus. Note that we're only including roughly 44% of all the New Albany campuses IT…
Source: Epoch AI - Nov 1, 2024Meta Bowling Green · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins.
Source: Epoch AI - Oct 7, 2024NTT VA10 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7397-56-8403 (owner of record: Ntt Global Data Centers Va10 LLC Attn: Legal Dept).
- Oct 1, 2024Google Arcola · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Building 1 foundation started
Source: Epoch AI - Oct 1, 2024STACK Infrastructure NVA02 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery (a clear image of this c…
Source: Epoch AI - Sep 13, 2024Google New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 67 MW → 144 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 80 MW → 173 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also…
Source: Epoch AI - Aug 20, 2024Vantage Building 1 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111756-00.009 (no sale price disclosed).
Source: Licking County, OH — Auditor - Aug 20, 2024Vantage Building 2 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111756-00.009 (no sale price disclosed).
Source: Licking County, OH — Auditor - Aug 20, 2024Vantage Building 3 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111756-00.009 (no sale price disclosed).
Source: Licking County, OH — Auditor - Aug 15, 2024Amazon Web Services · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 050-002806 (no sale price disclosed).
- Aug 15, 2024Amazon Web Services · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 050-002806 (no sale price disclosed).
- Aug 15, 2024Unnamed data center · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 050-002806 (no sale price disclosed).
- Aug 15, 2024Unnamed data center · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 050-002806 (no sale price disclosed).
- Jul 3, 2024STACK · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7595-76-6544.00 (owner of record: Si Nva 04 LLC Attn Property Tax).
- Jun 25, 2024Amazon IAD-1 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0343 09 0004A (no sale price disclosed).
- Jun 25, 2024Amazon IAD-22 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0343 09 0004A (no sale price disclosed).
- Jun 23, 2024QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 47 MW → 94 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 66 MW → 132 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 2 (retrofitted) is operational. This is based on Building 2 looking compelte, and construction around Building 1 and 2 being mostly cleared. A colored motion artifact on one of the Building 1 cooling tower fa…
Source: Epoch AI - Jun 6, 2024QTS NAL 2 DC1 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 094-107502-00.003 (no sale price disclosed).
Source: Licking County, OH — Auditor - Jun 6, 2024QTS NAL 2 DC2 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 094-107502-00.004 (no sale price disclosed).
Source: Licking County, OH — Auditor - Jun 6, 2024QTS NAL1 DC1 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 094-106404-00.011 (no sale price disclosed).
Source: Licking County, OH — Auditor - Jun 6, 2024QTS NAL1 DC2 · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 094-106404-00.010 (no sale price disclosed).
Source: Licking County, OH — Auditor - May 31, 2024Microsoft-Nebius New Jersey · NJ
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins for northern two buildings (Building 1-2).
Source: Epoch AI - May 6, 2024Amazon IAD-500 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0001 (no sale price disclosed).
- May 6, 2024Unnamed data center — Redskin Drive · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0002 (no sale price disclosed).
- May 6, 2024Unnamed data center — Redskin Drive · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0242 14 0003 (no sale price disclosed).
- Apr 30, 2024CoreWeave Chester VA · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 18 MW → 27 MW
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 25 MW → 38 MW
Source: Epoch AI - Apr 29, 2024Google Bristow · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers. Building 2 is undergoing construction.
Source: Epoch AI - Apr 20, 2024Google New Albany · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.
Source: Epoch AI - Apr 1, 2024Google Columbus · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 operational. No visible construction and roads/parking complete around the building. Building 2 chillers are beginning construction. Foundation work begins for Building 3.
Source: Epoch AI - Apr 1, 2024Google Fort Wayne · IN
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: First signs of development/land clearing
Source: Epoch AI - Apr 1, 2024QTS Richmond 3 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins.
Source: Epoch AI - Feb 9, 2024Anthropic-Amazon New Carlisle · IN
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins in the northern section
Source: Epoch AI - Jan 31, 2024CoreWeave Chester VA · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1's second data hall scheduled to come online this month.
Source: Epoch AI - Jan 29, 2024QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 (retrofitted) is operational. This is based on it looking complete, and cooling towers possibly showing water vapor plumes, in this Google Earth image. Building 2 has chillers added to the roof and perimete…
Source: Epoch AI - Jan 1, 2024Google Lancaster · OH
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 operational. This is estimated based on construction progress in October 2023. This also corresponds to a 2023 article where a Google spokesperson says that the "the Lancaster data center will open later th…
Source: Epoch AI - 2024Equinix Ashburn DC18 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0193 — Approved, 161,950 sq ft proposed.
- 2024Equinix DC22 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0047 — Active, 96,842 sq ft proposed.
- 2024Proposed data center — Beaumeade · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0047 — Active, 96,842 sq ft proposed.
- 2024Proposed data center — Beaumeade · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0077 — Active, 1,176,000 sq ft proposed.
- 2024Proposed data center — Broad Run Business Center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0155 — Approved: Conditionally, 600,742 sq ft proposed.
- 2024Proposed data center — Commonwealth Center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0105 — Active, 285,322 sq ft proposed.
- 2024Proposed data center — Concorde Industrial Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0002 — Active, 449,311 sq ft proposed.
- 2024Proposed data center — Crosstrail Industrl Land Condo · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0211 — Active, 304,794 sq ft proposed.
- 2024Proposed data center — Digital Dulles Land Condo · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0060 — Active, 4,355,759 sq ft proposed.
- 2024Proposed data center — Downs Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0041 — Active, 1,751,803 sq ft proposed.
- 2024Proposed data center — Dulles Trade Center 2 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0042 — Active, 835,330 sq ft proposed.
- 2024Proposed data center — EPLAN-2024-0058 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0058 — Active, 256,550 sq ft proposed.
- 2024Proposed data center — EPLAN-2024-0163 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0163 — Active, 106,332 sq ft proposed.
- 2024Proposed data center — EPLAN-2024-0205 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0205 — Active, 1,239,000 sq ft proposed.
- 2024Proposed data center — EPLAN-2024-0212 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0212 — Active, 401,050 sq ft proposed.
- 2024Proposed data center — Farah Naples · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0184 — Active, 101,092 sq ft proposed.
- 2024Proposed data center — Gateway North · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0178 — Active, 76,275 sq ft proposed.
- 2024Proposed data center — Holiday Center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0056 — Active, 973,305 sq ft proposed.
- 2024Proposed data center — LEGI-2024-0037 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0037 — Active, 444,307 sq ft proposed.
- 2024Proposed data center — LEGI-2024-0039 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0039 — Active, 1,359,153 sq ft proposed.
- 2024Proposed data center — Loudoun Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0030 — Active, 666,000 sq ft proposed.
- 2024Proposed data center — Loudoun Tech Center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0058 — Active, 196,138 sq ft proposed.
- 2024Proposed data center — Mercure Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0161 — Active, 76,020 sq ft proposed.
- 2024Proposed data center — Mercure Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0162 — Active, 178,648 sq ft proposed.
- 2024Proposed data center — Mercure Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0180 — Active, 101,579 sq ft proposed.
- 2024Proposed data center — Mercure Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0181 — Active, 104,556 sq ft proposed.
- 2024Proposed data center — Mercure Business Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0210 — Active, 48,120 sq ft proposed.
- 2024Proposed data center — Mid Dulles Center · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0154 — Active, 374,670 sq ft proposed.
- 2024Proposed data center — Paragonpark · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0200 — Active, 768,255 sq ft proposed.
- 2024Proposed data center — Prologis Exchange · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0036 — Active, 697,500 sq ft proposed.
- 2024Proposed data center — Prologis Park Gateway · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0004 — Active, 1,089,044 sq ft proposed.
- 2024Proposed data center — Spring Valley Farms · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0074 — Active, 3,250,000 sq ft proposed.
- 2024Proposed data center — Steeplechase · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0081 — Approved: Conditionally, 244,400 sq ft proposed.
- 2024Proposed data center — Sterling Park Ip · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan EPLAN-2024-0182 — Active, 52,744 sq ft proposed.
- 2024Proposed data center — Summit At Dulles · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0061 — Active, 592,772 sq ft proposed.
- 2024Proposed data center — TLREZN2024-0003 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan TLREZN2024-0003 — Active, 825,500 sq ft proposed.
- 2024Proposed data center — Tuscarora Crossing Lb1 Ph1 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan approved: Loudoun County site plan EPLAN-2024-0059 — Approved: Conditionally, 520,950 sq ft proposed.
- 2024Proposed data center — Uss Industrial Park · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permit / site plan filed: Loudoun County site plan LEGI-2024-0003 — Active, 2,275,600 sq ft proposed.
- Dec 21, 2023Amazon Web Services · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111618-04.000 (no sale price disclosed).
Source: Licking County, OH — Auditor - Dec 21, 2023Amazon Web Services · OH
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 095-111618-04.000 (no sale price disclosed).
Source: Licking County, OH — Auditor - Oct 20, 2023QTS Manassas DC2 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7695-48-5650 (owner of record: Qts Manassas I Dc2 LLC).
- Oct 20, 2023QTS Manassas DC3 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed recorded for parcel 7695-58-1491 (owner of record: Qts Manassas I Dc3 LLC C/O Blackstone Property Advisors).
- Oct 4, 2023Digital Realty IAD30 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0332 01 0010D: $43,000,000.
- Oct 4, 2023H5 IAD31 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0332 01 0010D: $43,000,000.
- Oct 4, 2023H5 IAD32 · VA
- ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Land acquired: Deed/transfer recorded for parcel 0332 01 0010D: $43,000,000.
- Oct 1, 2023QTS Richmond 1 · VA
- Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land cleared for site expansion, some materials down at substation site. We assume that Buildings 1 and 2 are not running AI workloads at this point due to the lack of cooling infrastructure.
Source: Epoch AI